Project descriptions:
Location: Waterloo
winter 2021
Output: a new kitchen and a full bathroom
The project consisted of the followings:
- Cutting the concrete and drain installation
- Framing of walls and boxes on the ceiling
- Wiring for lights and fan
- Ceiling fan installation
- Piping for shower, vanity and toilet
- Ducting for air register close to the floor
- Drywall installation, tape and mud
- Installation of shower, toilet, vanity and mirror