Project descriptions:
Location: Kitchener
Spring 2021
Output: Full bathroom
The project consisted of the followings:
- Framing boxes on the ceiling and some changes to have 3 windows
- Cutting concrete and relocate shower drain an fixing the concrete floor
- Shower base installation
- Ceiling fan installation
- Wiring for lights, fan and floor heat
- Piping for shower, vanity and toilet
- Insulation installation and vapor barrier
- Ducting for air register close to the floor
- Drywall and cement board installation
- Tape, mud and painting
- Building shelves beside shower
- Three windows installation and casing
- Floor heat installation and tilling
- Installation of shower panel, shower glass door, toilet, wall mounted vanity and mirror