Quality is not an accident. It's the result of intelligent efforts.
Project descriptions:
location: Elmira Summer 2019 Output: A 650 sq-ft basement includes a recreation room, a utility room, a bathroom, and a laundry room The project consisted of the followings:
Designing the area according to the customers criteria,
Drawing a sketch and obtaining the construction permit from the city
Estimating and ordering the required materials
Project execution
Passing 6-step inspection: framing, insulation, plumbing, wiring, electrical and final inspection